With our scheduled Dig Day, our team will Excavate, Steel, and Plumb the pool. This is an all day event. By the time we're finished the skeleton formation of your pool will be finished.
Once Inspections are completed we will schedule a Gunite Shoot. This will create the concrete shell of your pool design.
We order all materials to the worksite before any construction is made. This allows us to have all materials onsite without having any setbacks. We paste the area of the pool before laying out the Tile and Coping. We do this to prevent any water getting through causing any erosion.
All metals within 5ft of water will be grounded. All pool equipment is placed on a separate circuit to avoid any overload on existing circuits.
Brick, Grandscape, and Travertine are the different decking we provide. With your selection made it'll already be ready on the job site. Depending on how much decking is order, this process can take from 1-3 days.
We take pride in our plaster finishes. PebbleTec provides our customers the best plaster in the pool industry. Giving all our pools a sharp detailed color.
Once plaster is completed, we will then fill up the pool and acid wash the decking. Plumbing is labeled and cleaning system installed.
Your dream pool is now fully installed. We then run through pool school with you. Showcasing every feature the pool comes with and how to handle it with care. Once we've reviewed you're ready to start swimming! Enjoy your dream oasis!